top of page

4MW Diesel Hybrid Power Station - Alderney, Channel Islands

TSL is working with Alderney Electricity Company, part of the States of Alderney in designing, building, commissioning and supporting the hybrid power station on the island. TSL has been responsible for all aspects of the design/build and management of the contract.

  • 8 x 520kW Perkins Diesel Engines

  • ComAp Intellimains and Intelligen Controls on HV/LV and Generation with TSL designed control strategy

  • Design and Implementation of the SCADA System for HV/LV and Generation

  • Sole source of power on the island

  • PV Installation

  • Wind Installation Consultancy

  • Wave Power Consultancy

  • Vehicle Integration to Grid (V2G) – Electric Cars and Vans

  • Support on existing diesel systems and modernisation for the build period

  • Complete 3D Modelling In House

Power in Numbers

4

Megawatts

50

Locations

200

Volunteers

Project Gallery

bottom of page